Harrington Property Services

170 questions people ask us.

Everything people ask before booking a roofer. If yours is not here, ring and ask it — we do not mind.

General

01

How quickly can you come out?

For an active leak, the same day wherever we can — the call-out line runs 24 hours. For a survey on non-urgent work we are usually with you within a few days.

02

Do you charge for a quote?

No. Surveys and written quotes are free anywhere we work, and there is no call-out fee for pricing a job. You only pay if you decide to go ahead.

03

Which areas do you cover?

Camberwell is home, and the streets around it are where we work most often — Peckham, Dulwich, Herne Hill, Brixton, Clapham, Streatham, Tooting, Balham, Wandsworth, Battersea, Putney, Fulham, Wimbledon, Brockley and West Norwood. We travel further for larger jobs.

04

Are you insured?

Yes. We carry public liability insurance and will send you the certificate before we start — ask for it, and ask any other roofer for theirs too.

05

Are you VAT registered?

No, which means there is no VAT added to your invoice.

06

Who actually turns up?

The people who quoted the job. Harrington is Vanslow Lee and a small team who have worked together for years — it is not a call centre passing your job to whoever is free.

07

Do you do work other than roofing?

Roofing is what we do — repairs, re-roofs, flat roofs, chimneys and lead. Around the same houses we also take on exterior painting, pressure washing and small building repairs, usually while the scaffold is already up.

08

How do I know the reviews are real?

They are on Checkatrade and Google rather than typed onto this website, so we cannot edit them and neither can anyone else. Both links go straight to the profile — read the lot there, in whatever order the platform puts them.

Roof Repairs

Read the page →
01

What affects the cost of a roof repair?

The three things that move the price are access, height and whether the battens underneath have gone. Among single repairs, a slipped slate is at the cheaper end and lead flashing to a chimney at the dearer end.

02

Can you repair the roof without scaffolding?

Often, yes. A single tile on a two-storey house is usually a ladder and a roof ladder job. Anything along a ridge, a full slope, or work on a third storey normally needs a tower or scaffold for safety, and we will tell you which at the survey rather than after.

03

How long does a roof repair take?

Most single repairs are between an hour and a day. A slipped slate or a cracked tile is an hour once someone is up there. Re-bedding a ridge or renewing a chimney flashing is half a day to a day. A patch of slope stripped back to new battens and membrane is two or three days. Where a tower or a scaffold is needed, add a day at each end for it to go up and come down.

04

Will you match my existing tiles or slates?

Nearly always, and it matters more on a repair than on a whole roof — one bright new tile among a hundred weathered ones is exactly what people notice. We match size, profile and thickness, use reclaimed stock where a profile is out of production, and hold the replacement up against the roof so you can see the match before it is fixed rather than after.

05

Will my insurance cover it?

Sometimes, and it is worth reading the policy before you assume either way. Insurers separate sudden damage from gradual deterioration, and the condition of the roof beforehand is usually what decides which one yours is. Tell us at the survey if a claim is likely: we photograph everything before we touch it, itemise the repair, and we handle insurance jobs regularly.

06

How do I know it is the roof and not something else?

You often do not, and it is worth ruling out the cheap causes first. Blocked gutters, a cracked render, a failed window seal and condensation in a cold loft all look like roof leaks. We check those before we sell you a roof repair.

07

Do you guarantee repairs?

Ask us for the terms in writing when you get your quote — the length, and exactly which part of the roof they cover. A repair guarantee covers the repair, not the slopes nobody touched, and that distinction is worth having on paper.

Emergency Roof Repairs

Read the page →
01

How quickly can you get to an emergency?

Both numbers ring through to the 24-hour call-out line. In daylight, across SE5 and the SE and SW postcodes next to it, we can usually be with you the same day and often within a couple of hours. Overnight, and during a storm when every roofer in London is already out, it takes longer. You will get a real time when you ring rather than a promise printed on a web page.

02

What affects the cost of an emergency roof repair?

The hour, and whether the roof can be reached from a ladder. If the emergency repair is also the permanent one — a slipped slate, a blocked valley — that is generally the whole bill. Where a stripped slope has to be sheeted, the permanent repair is quoted separately.

03

Do you charge more at night or at the weekend?

Out-of-hours attendance costs more right across the London trade, because it is two people working at antisocial hours. What matters is that you know the rate before we set off. Ask when you ring and you will be told the figure, and whether the call-out charge is credited against the permanent repair if you go ahead with it.

04

Can a roof be repaired in the rain?

Parts of one. Slates go back, gutters get cleared, sheeting gets battened down and a split flashing can be sealed temporarily. Bitumen, mortar and liquid coatings all need a dry surface to bond or cure, so those repairs wait for weather. Anyone torching felt onto a soaking deck in a downpour is building you a leak for next year.

05

How long will a temporary cover last?

Days to a few weeks. Sheeting starts losing to UV and wind the moment it goes on, and its fixings work loose. What it buys is time — time for the roof to dry out, for a scaffold to go up if one is needed, and for the repair to be done properly. It is not a substitute for a roof and we will not sell it as one.

06

My ceiling is bulging with water. What should I do?

Turn off the lighting circuit at the consumer unit if the water is near a fitting. Put a bucket under the lowest point of the bulge and pierce it once, in the middle, with a screwdriver. It will drain steadily. Plasterboard can hold several litres and then drops the entire sheet, which turns a ceiling stain into a ceiling replacement.

07

Will my insurance pay for it?

Sudden storm damage is usually covered and wear and tear usually is not. Most policies also oblige you to limit further damage, which is what a make-safe does, so keep the invoice and send it in with the claim. We photograph everything before we touch the roof and write the report in the terms insurers ask for. We take on insurance work regularly.

08

Do I need to be at home?

For work on the outside, usually not — we can attend, make the roof safe and photograph what we found. We do need to get to whatever the water is coming through, so if the leak is in a flat, a loft or above a locked room, somebody with a key has to be there. On a converted house with a shared roof, the freeholder needs telling as well.

09

Which areas do you reach at short notice?

Camberwell is the base, and the quickest roofs to reach are in SE5 and the postcodes around it — Peckham, Dulwich, East Dulwich, Herne Hill, West Norwood, Brockley, Brixton, Clapham, Streatham, Tooting, Balham, Wandsworth and Battersea. We also work Putney, Fulham and Wimbledon, and out to Kingston and New Malden, which take longer at night.

Flat Roofing

Read the page →
01

What affects the cost of a flat roof replacement?

The covering first: felt is the cheapest to lay, rubber sits in the middle and fibreglass at the top. Then the deck, which nobody can price properly from the ground, so we quote a rate per square metre for board replacement before we lift anything. A warm deck adds material and height at the edge. Rooflights, kerbs, pipes and upstands add labour, and a plain rectangle is cheaper per square metre than a small roof with four corners. Scaffold and a skip are separate lines on the quote, and in South London access, parking and waste disposal are real costs.

02

Which is best — felt, rubber or fibreglass?

For a large plain roof, EPDM rubber: it goes down in one sheet with no seam in the middle and manufacturers put its design life at forty years or more. For a roof you walk on, or one with awkward corners and a balcony finish, GRP fibreglass: it cures into a single hard shell. Felt is the cheapest and the shortest-lived at fifteen to twenty-five years, and it is still a reasonable choice on a garage you do not intend to keep forever. We will tell you which we would put on your roof and why.

03

Can you lay a new roof over the old felt?

Sometimes, with a liquid system or an overlay board, and only if the deck underneath is dry and sound. We check it with a moisture meter and by walking it before we agree to overlay anything. If the boards are soft anywhere, covering them just buys a year and hides the rot while it spreads.

04

What is a warm roof, and do I need one?

A warm roof puts rigid insulation on top of the deck, under the covering, so the timber stays warm and dry rather than sitting on the cold side where condensation forms. A cold roof puts it between the joists, which is how most older extensions were built and why their timbers rot. Building regulations generally call for insulation to about 0.18 W/m²K once you renew more than half of a roof, and on a flat roof that means a warm deck. It adds cost and about 100 to 150 mm of height at the edge.

05

Why does my flat roof hold water after it rains?

Either the fall was never built into the deck, or it has settled out of it, or the outlet is blocked or sits in the wrong place. Water still standing two days after rain is ponding, and it shortens the life of any covering. Sometimes we can build the fall back with tapered insulation on a warm deck; where the joists themselves have dropped, it needs firring pieces or a new deck.

06

How long does the work take?

A garage roof is one to two days. A rear extension is two to four, depending on the deck and whether a warm build-up is going on. GRP needs a dry day above about 5°C to cure, so in winter we plan around the forecast; EPDM can go down in cooler weather, which is often the deciding factor between October and March.

07

Do I need building control approval for a new flat roof?

Re-covering more than about a quarter of a roof, or changing to a different type of covering, is notifiable to building control, and the insulation rules bite once more than half of it is renewed. Straightforward like-for-like repairs are not. We will tell you at the survey which category your job falls into rather than leaving you to find out afterwards.

08

How long should a flat roof last?

Torch-on felt fifteen to twenty-five years. GRP fibreglass twenty-five to thirty. Manufacturers give EPDM rubber a design life of forty years or more. Liquid systems fifteen to twenty-five, depending on the resin and what they were laid over. In every case the number assumes the fall drains and the outlets are kept clear — a ponding roof will not reach the low end of its range.

09

Can you repair my flat roof instead of replacing it?

If the deck is firm and the failure is one seam, a couple of blisters or a lifted upstand, yes, and that is what we will quote for. If water is standing across the roof, or the boards give underfoot, a repair is a false economy and we will say so. A rough rule: once more than about a third of the surface has gone, replacing it costs less over ten years than repairing it twice more.

EPDM Rubber Roofing

Read the page →
01

What affects the cost of an EPDM rubber roof?

Whether the deck survives, first. A sound deck is a re-cover; a soft one is a strip and a rebuild, and nobody can tell you which from the ground. A warm deck is the biggest single addition and is normally required when the whole covering is replaced. Upstands, a rooflight kerb and pipes through the roof matter more than area, and access, a skip and a suspended parking bay are real costs on a South London terrace. You get one fixed figure after we have looked, with the deck, insulation, trims and outlet itemised.

02

How long does a rubber roof last?

Manufacturers put the design life of EPDM at forty years or more, and sheets laid in Britain in the 1970s are still in service. It has no bitumen oils to lose, so it does not harden and crack the way felt does. Nearly every failure we are called to on a rubber roof is at a corner, an upstand or a seam rather than anywhere in the sheet.

03

Is rubber better than felt?

For most extensions, garages and garden rooms, yes, for two reasons: it goes down in one piece with no joints in the middle of the roof to open, and it does not oxidise and split with age. Felt is cheaper on the day, and a proper three-layer torch-on roof will give you fifteen to twenty-five years. Its weakness is how often it is laid short — two layers instead of three, narrow laps, low upstands — and it needs a blowtorch on your roof to lay at all.

04

Should I have EPDM or fibreglass?

Fibreglass if you will walk on the roof, or if it is full of corners, pipes and awkward junctions, because GRP is a hard walkable finish that follows shapes a sheet cannot. Rubber if the roof is a plain rectangle, if it is large, or if the weather is against you — GRP needs a dry day above about five degrees to cure and rubber does not. Both comfortably outlast felt.

05

Can you lay rubber over my existing flat roof?

Sometimes. If the old felt is firm and dry across the whole roof we can board over it and bond the membrane to the board, which saves the strip and the skip. If the deck is soft anywhere, or there is any sign of trapped moisture, we strip it — laying a forty-year membrane over a wet deck buries the problem rather than fixing it. We can only tell you which after we have been up and had a proper look.

06

Do I need Building Regulations approval for a new flat roof?

Usually yes, where the covering is being replaced rather than patched. Replacing more than half a flat roof's surface counts as renovating a thermal element, which triggers an insulation upgrade to around 0.18 W/m²K — in practice a warm deck with 120–150 mm of PIR on top of the boards. A like-for-like re-cover on a bare deck is rarely the quote to accept. We will tell you at the survey whether your roof falls under it.

07

Is the work guaranteed?

There are two separate things here and firms often blur them into one number. The membrane carries the manufacturer's own warranty, which depends on the system fitted and on the installer being registered with that manufacturer. The workmanship guarantee is a separate promise about how it was laid. Ask us for both sets of terms when you get the quote, and be wary of anyone quoting a single figure that covers both.

08

Can I have a rooflight or use the roof as a terrace?

A rooflight is straightforward: we build a timber kerb, dress the membrane up and over it and fit the unit to that. A terrace needs more. Rubber takes maintenance foot traffic but not furniture and daily use, so it needs paving pads over a protection layer, or GRP instead. Tell us at the survey if a terrace is the plan, because it changes the whole build-up and the price.

09

How long does the job take, and what happens if it rains?

A garage roof is usually a day, an extension two, and three if the deck comes off and goes back. The deck has to be dry for the adhesive, so a wet forecast moves the start date rather than the finish. Once the sheet is bonded and the edges trimmed the roof is watertight that evening, and we do not leave a roof open overnight.

10

Which areas do you cover for flat roofing?

The yard is in Camberwell, so most of this work sits in the SE postcodes around it — SE5, SE15, SE22, SE24 and SE4. Brixton, Clapham, Streatham, Balham, Tooting, Wandsworth and Battersea are all inside the same ring, and we will travel to Putney, Fulham, Wimbledon, Kingston and New Malden for a full replacement rather than a patch.

GRP Fibreglass Roofing

Read the page →
01

What affects the cost of a GRP fibreglass roof?

Whether the old deck can stay, which we cannot tell you until the covering is up. A warm deck is normally required if we are replacing most of the covering, and it is the biggest single add-on on an extension roof. Rooflight kerbs, soil pipes, corners and abutments take longer than open area, so a fiddly 12 m² roof can cost more than a plain 20 m² one. In London, access, skips and parking all count, and access is the biggest single variable. We give you a fixed figure in writing after we have been up and looked.

02

How long does a fibreglass roof last?

Twenty-five to thirty years is a realistic figure for a properly built one, with a topcoat re-coat somewhere in the middle if it gets full sun. Manufacturers advertise longer. What actually determines the number is the deck: a rigid, dry, screwed-down deck lasts decades, and a flexing one cracks the laminate in a few years.

03

Can you walk on a GRP roof?

Yes. That is the main reason to choose it. It takes maintenance traffic without paving pads, and for a balcony or roof terrace we broadcast an anti-slip grit into the topcoat so it is not lethal when wet. If a roof is going to be used as a floor, GRP is usually the right system.

04

Should I have fibreglass or EPDM rubber?

GRP if the roof will be walked on, or it is full of corners, pipes and rooflights. EPDM if it is a big plain rectangle, or the work has to happen in cold or unsettled weather — rubber goes down in conditions where resin will not cure. Both outlast felt by a long way. We will tell you which your roof wants.

05

Can you lay fibreglass over my existing felt roof?

No. GRP has to be laid on a clean, dry, rigid deck, and old felt is none of those things. Anything sound enough to keep is better overlaid with a liquid system, which is designed for exactly that. If you want fibreglass, the old covering comes off and we see what the boards are like underneath.

06

Can a fibreglass roof be laid in winter?

Sometimes. The resin needs a dry deck and a temperature above about 5 °C to cure properly, so a cold, wet spell stops work rather than slowing it. We watch the forecast and book accordingly. If the roof has to be covered now and the weather will not allow GRP, we would fit EPDM instead and say why.

07

My fibreglass roof has cracked. Does it all need replacing?

Usually not. GRP repairs into itself: the area is ground back, fresh mat and resin laid over it and the topcoat made good, and the repair becomes part of the original sheet. A straight-line crack normally means a board joint moving underneath, so we check the deck before repairing — otherwise it reappears a metre away.

Liquid Roofing

Read the page →
01

What is liquid roofing, and is it the same as the roof paint from the merchant?

No. Liquid roofing is a resin waterproofing system applied cold in coats, with a reinforcing fleece bedded into it, which cures into one continuous membrane with no joints. The tins of roof seal or liquid rubber sold over the counter are thin unreinforced acrylics meant to buy a year or two on a failing roof. A proper system is around two millimetres thick, laid to a manufacturer's specification, and carries a warranty from the maker.

02

What affects the cost of a liquid roof?

Area matters less than you would think — it is the metres of edge and the number of penetrations that take the time. Preparation counts as well: what has to come off, what has to dry out and what has to be primed. Then the resin: a cold-cure PMMA with a long manufacturer's warranty costs considerably more than a polyurethane, and both cost more than an acrylic maintenance coating. A plain overlay on a sound felt roof sits at the cheaper end and a heavily detailed roof on a top-tier resin at the dearer end. An overlay usually comes in below a full replacement because there is no strip-out and no skip.

03

Can you put a liquid roof over my existing felt or asphalt?

Often, yes, and it is the case liquid does best. The old covering has to be firmly bonded, dry all the way through, and sitting on a deck with no soft spots. We test for that before quoting and cut a small core where the roof looks suspect. If the insulation underneath is wet, coating over it traps the water and the new membrane will blister within a couple of summers — in that case we quote a strip and re-lay and show you why.

04

How long does a liquid roof last?

Fifteen to twenty-five years is the realistic range. Where you land in it depends on the resin, the film thickness that went on and how much sun the roof takes. Unlike a sheet system the end of that life is normally a clean and a fresh top coat rather than a replacement, provided the reinforced layer underneath is still sound.

05

Can it be laid in winter?

Some systems, yes. PMMA-based resins cure at low temperatures and tolerate a damp start. Polyurethanes and acrylics want a dry surface, air above about five degrees and a dew point comfortably below the roof temperature, or the film will not form properly. We pick the system for the season and tell you which one we have specified. If the forecast will not allow a proper cure we move the date.

06

Can I walk on it?

Yes, where it is specified for traffic. We broadcast a quartz aggregate into the top coat and seal over it, which gives a non-slip surface that takes regular use — the standard finish for a balcony, a walkway or a terrace with a door onto it. Tell us at the survey if the roof will be walked on, because it changes both the system and the price.

07

Would EPDM or fibreglass be better for my roof?

If the roof is a plain rectangle and the deck is coming off anyway, usually yes — a rubber sheet or a laid fibreglass laminate on an open deck is quicker work and normally cheaper. Liquid wins where there are details to go round, where the existing roof is sound enough to overlay, or where no flame can be used near the building. On a typical back-addition roof with a parapet gutter and a soil pipe through it, liquid is often both the neater and the cheaper answer. We will price both if you want to compare.

08

Does it need building regulations approval?

Renewing a roof covering counts as renovating a thermal element under Part L, which can bring a duty to upgrade the insulation to current standards. A liquid overlay leaves the existing build-up in place and is normally treated as a repair, so it usually does not. A strip and re-lay over a heated room usually does, and that changes the design and the cost. We will tell you which side of the line your job sits on, and where it is a close call your borough's building control team will confirm it.

New Roofs & Re-Roofing

Read the page →
01

What affects the cost of a new roof in South London?

Three things move the price most: the covering you choose, the scaffold the house needs, and what the timbers look like once the roof is open. Nothing is added for VAT, because the firm is not registered for it.

02

How do I know if I need a re-roof rather than a repair?

Spread rather than age. One slipped slate on a roof that is otherwise tight is a repair, whatever year the house was built. Slates coming off several different slopes, battens that will not hold a nail, and underlay that tears when you touch it in the loft mean the roof has reached the end. As a rule, once more than about a third of a slope has failed, replacing it beats repairing it again.

03

Do you have to strip the whole roof?

For a re-roof, yes. The battens and underlay under the covering are usually the actual problem, and you cannot renew them without taking the covering off. If only one slope has gone we can re-roof that slope on its own and tie it into the rest, which is common on the rear addition of a terrace.

04

Can you re-use my existing slates?

Often a good proportion of them. Welsh slate routinely outlives the nails and battens holding it, so we sort what comes off, re-hole the sound ones and re-lay them — usually on the front elevation where the roof is seen, with new slate on the rear. Spanish slate and old concrete tiles survive a strip far less well. We will not know the exact split until the roof is off, so the quote says what happens either way.

05

Do I need Building Control approval?

Yes for a full re-roof. Re-covering more than a quarter of a roof is notifiable work in England, and a change of material or a heavier covering brings structure into it as well. We are not on the Competent Roofer scheme, so the work is notified to your council's building control and inspected by them, and you get a completion certificate at the end. Keep it — it is the paper your buyer's solicitor will want.

06

Will I have to upgrade the loft insulation?

If more than half the roof is being renovated, Part L of the Building Regulations treats the roof as a renovated thermal element and asks for the insulation to be brought up to 0.16 W/m²K. In an open loft that is normally topping up to about 300 mm of mineral wool and costs very little alongside a re-roof. If the loft has been converted into a room, the insulation sits at rafter level and the work is more involved, so we price it separately and explain the options before you decide.

07

I live in a conservation area. Does that change what I can have?

It can. Replacing like for like is usually permitted development anywhere. Changing the covering on a slope that faces the street — slate to concrete tile, most often — may need consent in a conservation area, and Article 4 directions in parts of Southwark, Lambeth, Lewisham and Wandsworth remove permitted development rights from ordinary terraced streets. Roof windows are the other common question: a flush one within 150 mm of the slope is normally permitted development on any slope, and it is an Article 4 direction or a listing that changes that. We check your address against the borough's map before quoting.

08

How long does it take, and can I stay in the house?

Five to eight days for a terrace, one to two weeks for a semi, two to three weeks for a detached house, plus days lost to weather. You can live in the house the whole time. We strip one slope at a time and sheet everything before we leave each evening, so the house is never left open overnight. Scaffold goes up a day or two before and comes down within a few days of finishing.

09

What happens if you find rotten timbers once the roof is open?

We stop, photograph it, and phone you with a price before we cut anything. The quote includes a stated allowance for battens and small timber repairs so that the ordinary finds are already covered. Anything beyond that allowance is yours to approve or refuse, in writing, and the roof stays sheeted while you decide. Nobody should be handed a bigger bill at the end of a job they did not agree to during it.

10

Is a new roof guaranteed?

Ask us for the guarantee terms when you get your quote — the length and the scope, in writing, in front of you before you commit. A guarantee you have not read is not worth much. It is separate from the manufacturer's warranty on the slate or tile itself, which is its own document and yours to keep.

Slate Roofing

Read the page →
01

What affects the cost of a slate roof?

The slate you choose and what we find in the timbers move the price more than anything else. Welsh slate costs more than Spanish, and the state of the timbers is not known until the slates are off. On a full re-slate, the scaffold is part of the bill too.

02

How long does a slate roof last?

Welsh slate commonly runs to 100 years and often well beyond. Good Spanish slate does 50 to 80, fibre-cement 25 to 40. The fixings are the shorter life: nails, battens and mortar typically give out somewhere between 60 and 100 years, which is why old roofs get stripped and re-laid with slate that is still perfectly good.

03

My slates keep slipping. Do I need a new roof?

Not necessarily, but slates coming down in a different place each winter usually means nail sickness — the nails have corroded across the slope while the slate itself is sound. If it is confined to one area we repair it. If it is happening everywhere, repeating that repair costs more over ten years than stripping and re-laying the slope once.

04

Can you match my existing slates?

Nearly always. Most London terraces are laid in 500 × 250 mm or 600 × 300 mm slate, and both sizes are still quarried and widely reclaimed. We match size, thickness and colour. If a new slate is going to sit obviously proud of the old ones, we tell you before it goes on the roof rather than after.

05

Can my old slates be re-used?

Often. On a Welsh slate roof, half to two-thirds typically survive a careful strip. We sort them, re-hole them and lay the best on the elevation that is seen from the street, topping up with new slate on the rear. Anything cracked or delaminating goes in the skip rather than back on your roof.

06

Welsh or Spanish slate?

Welsh if the house is period, the front elevation is on show, or you are in a conservation area — it is the material the roof was designed around and it lasts longest. Good Spanish slate is a sound choice for a rear slope or a whole roof on a tighter budget, but the grade matters. Ask for the BS EN 12326 classification; W1/T1/S1 is the top of it.

07

Do I need permission to re-slate my roof?

Putting the same slate back is normally permitted development. Changing the material is not, and neither is anything on a listed building. Much of Dulwich, Herne Hill, Clapham and Brixton sits in conservation areas or under Article 4 directions where the council can require matching slate, so check with your borough before anything is ordered. Re-covering more than about a quarter of a roof also needs a Building Control notice.

08

Can slate be repaired without scaffolding?

A few slates within reach of a roof ladder, usually yes. Anything along a valley, a parapet gutter, a ridge or a full slope needs a scaffold. Slate is brittle and walking about on it breaks more than it fixes, so the scaffold is as much about your roof as about our safety. We tell you which you need at the survey, not afterwards.

09

Will my roof be open to the weather while you work?

No. We strip and re-lay in sections and sheet the roof watertight at the end of each day. A terrace re-slate typically runs 7 to 14 days including the scaffold going up and coming down. Heavy rain stops slating for a few hours; it does not leave your house open.

10

Do you guarantee slate work?

Ask us for the terms in writing when you get your quote, and keep the paperwork with the deeds — it matters when you sell. The slate carries its own manufacturer's warranty separately, which is a different document and a different promise.

Tile Roofing

Read the page →
01

What affects the cost of replacing roof tiles in London?

On a single slipped or cracked tile, most of the cost is getting to it safely. On a bigger job, what moves the price is the tile you choose, the scaffold, what the battens and underlay look like once the roof is open, and how complicated the roof is. Clay plain tiles cost more supplied and laid than concrete interlocking, because there are six times as many of them and every one is handled. Split battens, perished felt or rot at the eaves add days, and a hipped roof, valleys, dormers and chimneys all add detail work. Skip permits, parking suspensions and footway licences belong on the quote, not on the final invoice.

02

Can you match my existing tiles?

Usually. Most concrete interlocking profiles are either still made or have a current equivalent that sits correctly with the old ones. Clay plain tiles match on blend rather than exactly, and reclaimed tiles from the same era match best. Where a profile is out of production we source reclaimed stock or the closest current tile and hold it against your roof before anything is fixed, so you see the match rather than being told about it.

03

Why do my tiles keep slipping?

Almost always nail sickness. The steel nails holding the tiles have rusted through inside the roof, and on many 1950s to 1970s roofs only every third or fourth course was nailed in the first place. Re-fixing the ones that have moved buys time, but if several are going each winter the fixings across that slope have reached the end and the roof needs stripping and re-laying rather than patching.

04

How long does a tiled roof last?

Clay plain tiles give 60 to 100 years and frequently more. Concrete tiles give 40 to 60 before the surface weathers off and they turn porous. What rarely lasts that long is everything behind them — nails, mortar bedding and bitumen felt are usually done at 30 to 50 years. That is why so many roofs get replaced while the tiles themselves are still perfectly good.

05

Is a dry ridge better than mortar?

For most roofs, yes. A dry-fix ridge screws each tile down to a batten through a ventilated seal, so there is nothing to crack, nothing to re-bed in a few years, and the roof space vents at the highest point. Mortar still has its place on period and conservation roofs where the look matters, but under BS 5534 it can no longer be the only thing holding a ridge tile on — there has to be a mechanical fixing behind it.

06

Do I need scaffolding to have tiles replaced?

Not for one tile on a two-storey house — that is normally a ladder and a roof ladder. Anything along a ridge or a verge, a whole slope, or work at third-storey height needs a tower or a scaffold to be done safely and to be done properly, because nobody does careful work hanging off a ladder. If a scaffold is needed we say so at the survey and it appears on the quote as its own cost.

07

Do I need permission to re-tile my roof?

Replacing like for like on a normal house is usually permitted development and needs no planning application. Changing the material — clay to concrete, or slate to tile — is the one to check, especially in a conservation area, under an Article 4 direction or on a listed building, and the council is the only body that can answer it. Separately, building control has to be told when you re-cover more than about a quarter of a roof, or when the new covering is significantly heavier than the old.

08

My roof is slate — can it take concrete tiles instead?

Not without the timbers being looked at. Natural slate weighs roughly 30 kg per square metre, concrete interlocking tiles about 45, and clay plain tiles around 70. Putting plain tiles on rafters sized for slate can be a significant increase in load, and it is notifiable work. Sometimes the answer is an interlocking clay or a lightweight profile instead. We would rather have that conversation before the scaffold goes up than after.

09

How long does a re-tile take, and is my house open to the weather?

About one to two weeks for a terraced roof in concrete tile, longer for clay plain tiles or a hipped roof with a lot of detail. We only strip what can be re-covered, and the roof is made watertight at the end of every day rather than left under a sheet for the weekend. Rain slows the work; it does not leave your loft exposed.

01

What affects the cost of chimney repair in London?

Access is usually the largest single item, and on most terraces that means a scaffold. After that, most jobs run from recasting the flaunching and re-bedding the pots at the cheaper end to a full repoint of a tall stack at the dearer end. New lead flashing costs more where a back gutter is involved, and rebuilding a stack above the roofline costs more than repointing it. We are not VAT registered, so there is nothing to add on top.

02

Why is my chimney leaking when the roof is fine?

Because the stack is a hole in the roof with brickwork round it. Water comes in through cracked flaunching at the top, through a failed cement fillet or split lead where the stack meets the slates, through a back gutter that has silted up behind it, or straight through brickwork that is saturated. The roof either side can be perfect and you will still get a stain on the bedroom ceiling.

03

My chimney is leaning. Is it dangerous?

Take it seriously. A lean usually means sulphate attack has swollen the mortar joints all the way through, so the stack is weaker than it looks and it will keep moving. It is rarely about to fall, but it will not straighten and it cannot be repointed back into shape. The answer is a rebuild above the roofline, or removal. If it has moved suddenly after a storm, call us and we will make it safe first.

04

Can you repoint a chimney without scaffolding?

Rarely, and we would not want to. You cannot work safely on four faces of a stack from a ladder, and you cannot reach the back gutter at all. A small stack on a low rear roof can sometimes be done from a tower. Anything on a two- or three-storey front slope needs a scaffold, and we would rather tell you that at the survey than after.

05

Do I need permission to remove a chimney stack?

Usually some. Removing brickwork that carries load or supports a neighbour's flue is notifiable to building control, so it goes through the council or an approved inspector, often with a structural engineer's drawing. If the stack sits on a party wall — most London terraces — you also need to serve notice on your neighbour under the Party Wall etc. Act 1996. In a conservation area or on a listed building, check with the council before you commit to anything, because stacks are part of what the designation protects.

06

We never use the fireplace. Should we cap the chimney or take it down?

Capping is cheaper and reversible. It keeps the stack as part of the roofline, which matters on a terrace where every other house still has one, and it stops rain and birds getting in. The condition is that it must be vented top and bottom — a sealed flue condenses and you get damp on the breast inside. Take the stack down if the brickwork has failed and a rebuild is not worth it to you, and only after you have squared it with the neighbour if the stack is shared.

07

Do you line flues or fit wood burners?

No. We do the masonry, the flaunching, the pots and the weathering, and we make the roof around a stack watertight. Flue liners, stoves and gas appliances are HETAS and Gas Safe work and we are not registered for either. If you are bringing a fireplace back into use, have it swept and tested first by someone who is, and we will do the brickwork side.

08

There are birds nesting in my chimney. Can you fit a guard?

Yes, but not while the nest is active. Nesting birds and their nests are protected while in use, so an occupied jackdaw nest has to be left until the young have flown. After that the flue can be cleared and a bird guard or cowl fitted.

09

How long does chimney work take?

Repointing or new flaunching is a day. New lead is half a day to a day. A rebuild above the roofline is two to four days, plus a day either side for the scaffold to go up and come down. Weather stops brickwork — mortar will not cure properly in a hard frost — so a winter job can sit for a few days, and we would rather wait than lay work that will fail.

Leadwork & Flashing

Read the page →
01

What affects the cost of lead flashing repair in London?

Access is the biggest variable. Whether the work is reached from a ladder, a tower or a scaffold moves the price more than the lead does, and a scaffold on the footway needs a council licence. Where a scaffold is needed, it is quoted separately. After that comes how much has to come off to get at the lead, the masonry behind it, and the code and quantity of lead, which is sold by weight. Rot under a gutter or a dormer top turns the job into carpentry first, and nobody can price that until it is opened up.

02

Can lead flashing be repaired, or does it all have to come off?

Often it can be repaired. A clean split in lead that is otherwise the right code and the right length can be lead-welded, which fuses new metal into the old and lasts as long as the sheet around it. Replacement is the right call when the piece is too long, too thin, or crazed with fine cracks across a whole face.

03

My chimney leaks but the flashing looks fine from the ground. What else could it be?

Usually the back gutter, which you cannot see from below and which collects the most water. After that: cracked flaunching around the pots, an open joint in the stack letting rain soak through soft brick, a redundant flue with no cowl, or condensation inside an unlined flue. We check those before quoting for lead you may not need.

04

How long should lead flashing last?

Correctly detailed lead is measured in decades, not years — it will normally outlast the tiles or slates around it. Badly detailed lead fails on a much shorter clock: over-long pieces tend to split within about ten years, and a cement fillet used instead of lead often cracks within five.

05

Is lead on a roof dangerous?

Not to live under. Rolled lead sheet is stable and sits outside the building. The sensible precautions are practical ones: wash your hands after handling offcuts, keep children away from scrap, and do not drink or water vegetables with rainwater collected off a lead roof or a lead-lined gutter.

06

Why has my new lead gone white and streaked the brickwork?

That is lead carbonate, which forms as new lead weathers and washes down the wall as a chalky white stain. It is preventable, not inevitable. Patination oil wiped over the sheet on the day it is fitted stops it forming. The staining itself can usually be cleaned off the brick, but it takes work.

07

Can you not just seal it with flashing tape or mastic?

We can, as a temporary measure to stop water coming in tonight, and sometimes that is the sensible thing while a proper repair is scheduled. As a permanent fix it fails, because it traps water behind it against the masonry and hides the split that caused the leak. We will say which of the two we are doing.

08

Do you need scaffolding for leadwork?

Not always. A chimney flashing on a two-storey house can often be reached with a ladder and a roof ladder. A valley, a parapet gutter, a full stack re-lead or anything on a third storey normally needs a tower or a scaffold to be done safely and properly. We tell you which at the survey, before the price, not after.

09

Lead has been stolen from my roof before. What can be done?

Where theft has already happened once, replacing like for like is worth thinking about. Options are marking the lead with a forensic property-marking kit and signing it, or fitting a non-lead alternative on the exposed, reachable areas and keeping lead where it cannot be got at. We will price both so you can compare.

10

What if the leak comes back?

We come back to it. We water-test the finished detail before leaving the roof and photograph the work, so there is a record of what was done and how. Ask us for the guarantee terms when you get the quote, and check they are on the paperwork before any money changes hands.

Dormers & Roof Windows

Read the page →
01

What affects the cost of fitting a roof window?

Whether the opening already exists. A like-for-like replacement, with a new flashing kit, goes into the hole that is already there. Cutting a fresh opening costs more, because a rafter has to be cut and trimmed. A conservation rooflight costs more again, and nearly all of that difference is the window itself rather than the labour. Scaffold, where it is needed, is priced as its own line. We are not VAT registered, so nothing is added to the figure we quote you.

02

Do I need planning permission for a roof window?

Usually not. It is permitted development on any slope so long as the window does not stand more than 150 mm proud of the roof plane and is not higher than the ridge, and a side-facing window into a loft room has to be obscure-glazed. What removes that right is an Article 4 direction over your street or a listing, and a good deal of Southwark, Lambeth, Lewisham and Wandsworth carries an Article 4. A conservation area on its own does not: it decides which rooflight is appropriate rather than whether you may have one. We check before we quote.

03

Does a roof window need building regulations approval?

In most cases yes, and it is a separate process from planning. Cutting a new opening means cutting a structural rafter and trimming round it. A replacement unit has to meet the current Part L thermal standard. If the loft is used as a bedroom, the window may also need to serve as a means of escape, which sets a minimum openable size and a maximum sill height. Ask us at the survey and we will tell you what your job needs and who submits it.

04

My dormer leaks. Does the whole thing need replacing?

Usually not. Most dormer leaks are the flat top, the back upstand where it meets the main roof, or one cheek, and each of those can be dealt with on its own. What decides it is the deck. If the boards under the covering are dry and firm, a re-cover is the right answer. If they are soft, or the joist ends have rotted where they bear on the wall, the top has to come off and it becomes a bigger job. We lift a corner and photograph what is underneath rather than guessing at it.

05

Water runs down the inside of my roof window every winter. Have the seals gone?

Probably not. A roof window is the coldest surface in a loft room, and warm damp air condenses on the glass and runs down onto the sill. It looks like a leak and often gets sealed like one, which does nothing. Two things fix it: a lining cut with a horizontal head and a vertical sill so warm air washes over the glass, and ventilation — a trickle vent left open or the window on its night latch. A simple test is the weather. Wet after rain and dry in a cold dry snap is a genuine leak; wet on cold still mornings regardless of rain is condensation.

06

Do you need scaffolding to fit a roof window?

Often, yes. Anything at second-floor level, and any window big enough that it takes two people to handle on the slope, needs a proper working platform. A single small replacement low on a rear slope can sometimes be done from a tower. We say which at the survey, and if scaffold is needed it goes on the quote as its own line so you can see what it costs.

07

Do you build dormers from scratch, or only roof them?

Ask us about your specific job and we will give you a straight answer. Building a dormer from nothing is structural work — trimming the roof, a floor, a frame, insulation, building control sign-off — and it overlaps with a loft conversion. Re-covering a flat top, re-cladding or re-leading cheeks, remaking the flashings and fitting or replacing the window is roofing work and unambiguously ours. Tell us what you have and we will say which parts we do and where you would need a builder working alongside us.

08

What is a conservation rooflight, and will I be made to have one?

It is a roof window built to look like a Victorian cast-iron one: it sits almost flush with the slates instead of standing proud, the flashings are black rather than grey, and there is a glazing bar down the middle. Conservation officers across South London commonly ask for them on any slope visible from the street. They cost noticeably more than a standard window, so it is worth establishing whether you need one before you settle on a design.

09

Can you re-cover a dormer top in the same day?

A straightforward EPDM or GRP re-cover on a small dormer is one to two days, and GRP needs dry weather and a temperature that lets it cure, so we watch the forecast rather than start and hope. A dormer stripped back and re-roofed completely — top, cheeks, flashings and the window reset — runs three to five days. Scaffold going up and coming down adds time at either end of that.

Moss Removal

Read the page →
01

What affects the cost of roof moss removal in London?

Access moves it most: a rear slope that needs a tower rather than a ladder adds to the price. After that it is the size of the roof, from a terrace to a semi to a large detached house. The price covers hand scraping, the gutters and valleys cleared, and the treatment.

02

Is moss actually damaging my roof, or is it just untidy?

It depends what the roof is made of. On concrete tiles it does real harm over time, because it holds water against a face that is already going porous and frost then takes that face off a flake at a time. On clay it is much less serious. On natural slate it is close to cosmetic, since slate does not absorb water. What moss does on every roof is fill the gutters and valleys, and that is where water damage starts.

03

Can moss cause a leak?

Usually indirectly. It washes off the slope and packs the gutters, hoppers and valleys, and water then runs over the back of a full gutter and down the wall, or backs up in a valley until it passes the lead. On a low-pitched roof it can also dam water above the tile lap long enough for it to creep past onto the underlay. If water is coming in now, that is a repair rather than a clean, and the cause is worth finding first.

04

Do you pressure wash roofs?

No. A jet wash strips the cement-rich face off concrete tiles and leaves them rougher and more porous than before, so the moss returns quicker. It also drives water up under the head lap and onto the underlay, which on an older roof with perished felt is how a clean turns into a ceiling stain. Several tile makers exclude pressure-washing damage from their warranty. We scrape and brush by hand instead.

05

Will the moss come back?

On a shaded slope, yes, eventually. The treatment usually buys three to five years, and an open sunny roof goes longer. Cutting back whatever overhangs the roof does more for it than any product, and keeping the gutters clear lets the bottom courses dry out between showers.

06

Is the treatment safe around pets, plants and a pond?

Roof biocides are applied dilute and to the roof only. The sensible precautions are to keep pets and children off the paths underneath until it has dried, and to divert or cover any water butt or pond that the downpipes feed. Every product carries its own safety data sheet with the exact figures on it. Ask which one we are using and you can read the sheet before anything is applied.

07

Do you clear the gutters as part of it?

Yes. Clearing the gutters, hoppers and valleys is part of a roof clean, because that is where the moss has been ending up and it is the half of the job that actually prevents water damage. We do it after the roof rather than before, then flush it and watch it run. If the gutters themselves are cracked, sagging or pulling off the fascia, we show you and price that separately.

08

Should I have the roof coated or sealed afterwards?

We would say no, and we do not sell it. A sprayed coating seals a tile that needs to dry out, bridges the laps so a single tile can no longer be lifted for a repair, and does nothing about the nails and the underlay, which are what actually end a tiled roof. Surveyors also treat a coated roof as suspicious on a homebuyer's report. If there is money spare after a clean, the gutters or a tired flashing is the better place for it.

09

Do I need scaffolding for a roof clean?

Usually not. Most of this work is done from a ladder and a roof ladder, which spreads the load over the ridge so nobody stands on the tiles themselves. A rear slope with no ladder position, or a third-storey roof, normally needs a tower, and we say which at the survey rather than afterwards. A full scaffold is rare for a clean and would appear as its own line on the quote.

Gutters, Fascias & Soffits

Read the page →
01

What affects the cost of replacing guttering in London?

Access, more than anything. A rear elevation that needs a scaffold adds to the price on its own, and the scaffold is shown as a separate line on the quote. After that it is length: new uPVC guttering is priced by the metre, supplied and fitted, and one elevation of a typical terrace is around 8 metres.

02

Can you just clear my gutters, or do they need replacing?

Clearing first, almost always. If the gutter overflows only in heavy rain and is dry otherwise, it is blocked, and a clear costs a fraction of a replacement. Replacement is the honest answer when the plastic has gone chalky and cracked, when the profile is obsolete and no union fits, or when the fascia behind it has rotted and there is nothing solid to fix a bracket to.

03

How often should gutters be cleared?

Once a year for most South London houses, in late autumn once the leaves are down. Twice a year if you have a plane, sycamore or lime overhanging the roof, or if the roof has moss on it, because moss slides into the gutter every time it rains. A gutter that fills within months of being cleared usually has the wrong fall as well as debris in it.

04

Do I need scaffolding for gutter or fascia work?

For a gutter clear or a single joint on a two-storey house, no — that is a ladder job. For a whole run, a new fascia, or anything at third-storey height, yes, a tower or a scaffold. It is not only a safety matter: a gutter has to be hung to a consistent fall of a few millimetres per metre, and that cannot be judged accurately from a ladder that gets moved every two metres.

05

Can you cap over the old fascia boards instead of taking them off?

Where the timber underneath is sound and dry, yes, and it is cheaper. Where it is soft, capping over seals damp timber behind plastic and screws your new gutter brackets into rot. We will tell you honestly which you have — usually by probing the board at the survey — and we will not quote capping over wet timber.

06

My gutters are cast iron. Do I have to change them for plastic?

No, and often you should not. Cast iron rusts from the inside where debris sits, so a run that looks finished is frequently only pitted, and de-rusting, patching and repainting it gives another twenty years or so. In a conservation area or on a listed building the original profile may be the only thing permitted, and your council is the only body that can confirm that.

07

Water is running down my wall. Is it definitely the gutter?

Not necessarily, and it is worth ruling out the cheap causes first. A blocked or missing gully at the bottom of the downpipe, a cracked downpipe socket, a failed rendered sill, a leaking overflow pipe and a slipped slate above the eaves all produce the same stain. We check the whole path from roof edge to drain before quoting new guttering.

08

Do gutter guards work?

Sometimes. Brush and mesh guards do keep leaves out under a broadleaf tree, which is where they earn their keep. Under conifers, or on a roof shedding moss, the debris is fine enough to sit on top of the guard and mat, and you end up clearing the guard instead of the gutter. They also make a proper clear-out slower. We will fit them if you want them and say when we think they will not help.

09

Will new soffits stop my loft breathing?

They will if solid board is fitted over the existing eaves vents, and this is a common problem after a cheap fascia job. A cold pitched roof needs the equivalent of a continuous 10 mm opening along both eaves, more on a shallow pitch. Vented soffit board or over-fascia vents restore it, cost very little, and go in while the boards are off.

Roof Surveys

Read the page →
01

Do you charge for a roof survey?

Not for the survey that comes before a quote. That one is free, there is no call-out fee for pricing work, and you keep the photographs whether or not you book anything. A written condition report is a different job — one you commission on its own for a purchase, a letting or a budget — and it carries a fee because of the time it takes to inspect properly and write up.

02

What affects the cost of a written roof report?

A larger or more complicated roof costs more to report on than a normal terraced or semi-detached house, and a converted house or small block is priced per building. Beyond that, what moves the fee is access, how much of the roof can genuinely be reached, and how detailed the report needs to be — a photo set with a summary costs less than a schedule of every element with costed remedial work against each one.

03

How is this different from the survey I am getting when I buy the house?

A RICS home survey is a whole-house report and the roof is one section of it. The surveyor inspects from the ground, from a window and from the loft hatch, usually with binoculars, and does not put a ladder up or walk the roof. It is a sound report within that scope, and the scope stops at the gutter. A roofing inspection goes up and looks at the covering, the fixings, the flashings and the valleys at arm's length, which is the only way anyone can tell you whether the roof has five years left or twenty-five.

04

My homebuyer report says the roof needs further investigation. What does that mean?

It means the surveyor could see enough to be concerned and not enough to be specific — usually slipped or delaminating slates, a valley they could not see into, or a chimney they could not get near. It is a standard sentence, not a verdict. An inspection turns it into a list: what has failed, what has not, what putting it right would cost and whether any of it is urgent. On a purchase that figure is often worth negotiating with, and occasionally it is worth walking away from.

05

Can you survey a roof you cannot get onto?

Partly, and we will tell you which parts. From a ladder at eaves level, from inside the roof space and from a neighbouring vantage point, most of a normal two-storey roof can be read reliably. A third storey, a butterfly roof behind a parapet or a mansion-block roof usually needs a tower, a scaffold or a lift to be inspected properly. Where that is the case we say so and price it, rather than writing a report on a roof we have only squinted at from the pavement.

06

Do you do drone surveys?

A drone earns its place on roofs nobody can safely reach — high parapet gutters, church and block roofs, awkward valleys — and the photographs are genuinely useful. What it cannot do is lift a slate, press a deck or feel whether a tile is still held by its nail, and those are the checks that separate a roof with a problem from a roof at the end of its life. Anyone flying commercially in the UK needs a CAA operator ID and the right flyer credentials, so ask to see them from whoever offers you one. Where a drone is the right tool for your roof, we will say so at the survey.

07

How long does a survey take and when do I get the report?

An hour or two on site for a typical house, longer where there is a lot of roof or a run of parapets and valleys to work through. A written report normally follows within two to three working days, and faster where you are up against an exchange date. The free pre-quote survey is quicker: we generally talk you through the findings on the day and send the written quote shortly after.

08

Will you tell me I need a new roof when I do not?

No, and it is the right question to ask every roofer who climbs onto your roof. Most of what we survey needs a repair. The honest test is how much of a slope has failed rather than how old the covering is: scattered slipped slates over sound battens is a repair, while nail fatigue and perished felt across a whole slope is not. We hand over the photographs the judgement rests on, so you can weigh it yourself or take it to somebody else.

09

How often should a roof be inspected?

Every couple of years suits a house in normal condition, plus a look after any storm that has taken tiles off roofs in the street. Anything with a valley or a parapet gutter is worth checking each autumn, because a blocked one holds water above your ceiling instead of shedding it off the edge. Flat roofs want an annual look once they are past ten years old, which is when felt turns brittle and laps start to open.

Pressure Washing

Read the page →
01

What affects the cost of pressure washing in South London?

What moves the price most is how much moss and lichen there is, not the size of the area. Small jobs are priced as a visit rather than by the metre. On a block-paved drive the price covers re-sanding as well as the clean.

02

Will jet washing damage my patio or driveway?

It can, and nearly all the damage people show us was done by the wrong nozzle. A spinning turbo jet cuts lines into sandstone, old concrete flags and soft brick almost instantly, and those lines are permanent. Done properly — a rotary head at a fixed height for the open areas, a fan nozzle by hand at the edges, pressure matched to the surface — it does not. Where a surface should not be lanced at all, we say so before we quote.

03

Do you re-sand block paving afterwards?

Yes, and it is in the price rather than an optional extra. Washing empties the joints, and the kiln-dried sand in those joints is what stops the blocks rocking, chipping and creeping under a car. The sand goes in dry and gets topped up, because sand brushed into damp joints bridges at the top and leaves the joint hollow underneath. If a quote you are comparing does not mention re-sanding, ask what it will cost.

04

How long does it take, and can I walk on it afterwards?

A typical patio is half a day. A London drive is half a day to a full one, depending on how much moss is in the joints. You can walk on it as soon as we have finished. Give freshly re-sanded block paving a day or so before furniture and bins go back, so the sand beds down rather than getting dragged out again.

05

Will the green come back?

Eventually, yes. Algae needs only shade and damp, and a north-facing patio under a tree has both, so a wash on its own might stay clean for a year. A wash followed by a biocide treatment holds noticeably longer, because the treatment kills what is left in the surface instead of just rinsing the growth off the top. Cutting back whatever is shading the area does more than either.

06

Can you get rid of black spots, rust marks and oil?

Black spots are lichen and they come off with a biocide left to work, not with pressure — expect them to keep fading for a week or two after treatment. Oil on a drive usually lifts with a degreaser and hot water, though a stain that has soaked in for years may only ever fade. Rust and old cement smear need acid-based products, which we will not put on limestone or polished stone because they etch the surface. We tell you which marks we expect to shift before we start.

07

Do you need my water and electricity, and what about a hosepipe ban?

We work from an outside tap, and some machines also need a socket. If there is no outside tap, say so when you call — it changes how the job is priced and occasionally whether we can do it at all. We do not run hoses through the house. During a drought, a hosepipe ban stops a householder washing their own patio with a hose; a firm doing it as part of its business is normally outside that restriction, but every notice is worded differently, so we check what the water company has actually published rather than assume.

08

Is it safe on render, painted walls and decking?

Not at full pressure. Painted render, external wall insulation and lime-mortared Victorian brickwork all break up under a lance, and asbestos cement — still on plenty of old garages and sheds around here — must never be pressure washed, because that releases fibres. Those surfaces get low pressure and a treatment, or nothing. Timber decking is washed at low pressure along the grain; across it, the soft grain tears out and leaves a furry finish.

09

Can you clean the patio while you are here for the roof?

Usually, yes — it is the same firm and largely the same crew. If we are already coming to quote a roof it costs nothing to have the patio, the path and the drive priced at the same time, and it saves a second set-up.

Painting & Decorating

Read the page →
01

What affects the cost of painting the outside of a house in London?

The starting point is how much wall there is and how many coats it needs. Access and condition move the price far more than the paint does: badly flaking masonry that needs stripping and stabilising can add a great deal on its own.

02

How long does exterior masonry paint last?

Eight to twelve years on a sound, properly prepared wall, and rather less on a south or west elevation that takes the weather. Where it fails inside five years the cause is almost always preparation — a coat put over chalking paint, or over a wall that was still wet from a leak nobody had traced.

03

Why is the paint peeling off the front of my house?

Three usual causes. Water getting in from somewhere else — a blocked gutter, a split hopper, failed lead over a bay — and pushing the paint off from behind. Or a new coat applied over old paint that had gone chalky, so it never bonded to anything solid. Or an impermeable plastic coating on a solid brick wall that needs to dry through its face. The pattern usually tells you which: a stripe means a leak, a whole elevation means the paint.

04

Can you paint pebbledash, and should I paint bare brickwork?

Pebbledash paints perfectly well, but budget for it: the texture uses far more paint and takes noticeably longer to work into properly. Bare brick is a different question. Painting it is close to permanent — stripping it later is expensive and often damages the face of the brick — and it commits you to repainting every eight years or so. On sound London stock we would usually talk you out of it.

05

What months can you paint outside in London?

Realistically April to October. Masonry and exterior woodwork want the surface above about 5°C and rising, dry, and with enough daylight left to touch dry before the temperature drops. A coat put on late in an autumn afternoon is still soft when the dew falls and it will show permanently. We would rather move a date than paint into bad weather.

06

Do I need permission to paint the outside of my house?

Normally no — repainting an ordinary house is not development. Two exceptions matter here. A listed building needs listed building consent, including for a change of colour. And some conservation areas carry an Article 4 direction that removes the usual freedom, which is common enough in Southwark, Lambeth and Wandsworth to be worth one phone call to the borough before you start. If you own a flat, check the lease as well: external decoration is usually the freeholder's.

07

Is it safe to sand old paint on Victorian windows?

Not dry, no. Lead was only prohibited in paint for domestic use in the UK in 1992, and most older joinery has some of it under the later coats. Dry sanding or a hot gun run too hot puts lead into the dust and the air. The work is done with chemical stripper, a low-temperature hot-air gun, wet abrading and everything sheeted up and cleared away.

08

Do you do interior decorating as well, and what about newly plastered walls?

Yes — rooms, ceilings, skirting, architrave, door frames and small plaster repairs. New plaster needs to be properly dry first, four to six weeks over new blockwork, and the first coat must be a mist coat of thinned emulsion so it soaks in and keys. Full-strength paint straight onto fresh plaster sits on the surface and peels off in sheets later.

09

Is the paint included in the price?

Ask for that in writing whoever you use, because it is the commonest reason two quotes for the same house are not comparable. Ours names the product, says how many coats, and says whether we are supplying it or you are. A three-coat quote and a two-coat quote for the same wall should not look the same, and they usually do until you read them.

10

Can you decorate while you are working on the roof?

Often, and it is the cheapest time to do it. Scaffold costs the same regardless of which trade is using it, so fascias, soffits, rainwater goods and high exterior woodwork cost far less when the access is already up for a re-roof or a chimney. It is worth raising at the roof survey.

Building Repairs

Read the page →
01

What affects the cost of repointing?

Access moves the price more than the size of the wall does. The front elevation of a two-storey terrace normally needs a scaffold, and the scaffold is a cost on top of the pointing itself. Lime mortar on a soft period wall is at the dearer end.

02

Does the whole house need repointing, or just some of it?

Usually just some of it. Mortar weathers fastest where the rain hits hardest — the top few courses, under the sills, the exposed gable, the chimney stack. The sheltered side of a house is often sound after a century. A roofer or bricklayer who quotes a whole house without pointing at the specific failed areas is selling you square metres.

03

Is the crack in my wall serious?

Width and movement decide it. Hairline up to about 1 mm is decorating. Up to 5 mm is normally a rake-out and repoint. Above about 5 mm, or a stepped diagonal crack that runs through bricks rather than around them, or any crack you can see has widened since you noticed it, needs a structural engineer before anyone points it. Filling a live crack hides the evidence and it comes back.

04

Why did my brickwork start crumbling after it was repointed?

Almost certainly it was pointed in a hard sand-and-cement mix on soft brick. Cement is less permeable than a London stock, so water that gets into the wall can no longer escape through the joint and leaves through the brick face instead. One frost and the face pops off. Putting it right means cutting out the cement, replacing the worst bricks and repointing in something softer.

05

Why does the damp keep coming back after replastering?

Because the plaster was never the problem. Blown plaster with a tide mark and white salt bloom is water arriving from somewhere — a blocked gutter, a cracked downpipe, ground built up over the damp-proof course, a failed flashing. Skimming over it buries the symptom for about a year. Find the source, fix it, let the wall dry, then make good.

06

Can you match my bricks and my mortar colour?

Usually. Yellow London stocks are widely available reclaimed, and most Victorian and Edwardian facings can be matched closely enough that the repair disappears within a season of weathering. Some interwar and 1960s bricks are no longer made and the honest answer is a near match, which we will show you before we bed anything in.

07

Do you take on small jobs, or is there a minimum?

Small jobs are exactly what this work is — two metres of pointing, a loose coping, a cracked step. The efficient way to buy them is to group several into one visit, because the travel and the set-up cost the same whether we do one thing or six. Send us the whole list and we will price the lot, then tell you which parts are worth doing now.

08

Do I need permission to repair a garden or boundary wall?

Repairing a wall as it stands normally needs nothing. Rebuilding it higher does — one metre is the permitted-development limit where it fronts a road used by vehicles, two metres elsewhere. If the wall sits on the boundary line and is shared, the Party Wall etc. Act 1996 applies and your neighbour needs written notice before work starts. We will flag it; the notice is yours to serve.

09

Can you do the roof and the brickwork on the same visit?

Yes, and it usually saves money — it is the same firm and largely the same crew. If a scaffold is going up for a roof, the stack pointing, the parapet and the render around it should be done while it is there. The access is the expensive part.

Still not answered? Ring and ask. We answer questions for free whether you book or not, and the survey and the written quote are free too.

Call the team020 7205 4188 (opens in a new tab)Not urgentFree quote