A refurbishment is only as good as the roof over it: get the water out first, and everything done after it lasts.

  • Free survey and a fixed price in writing
  • A roofing firm first, based in Camberwell
  • 9.45/10 on Checkatrade from 53 reviews

Most period houses in South London come to a full refurbishment the same way. The last big spend was decades ago, the wiring is tired, somebody boarded up the fireplaces, and there is a damp patch in the back bedroom that three coats of paint have not shifted. The plan is new plaster, new floors and a wall knocked through. Very often, the damp patch comes from the roof.

Harrington is a roofing firm first, based in Camberwell, and we take on full refurbishments. Being roofers first is the useful part. The places a refurbished house goes wrong in its first winter — the gutter over the new plaster, the flashing at the back addition, the chimney capped without a vent — are roofing faults, and roofing is our own trade.

This page covers what a refurbishment involves, the rules that apply to it, and the questions to settle before anyone starts. The survey is free and the quote is a fixed price in writing.

01

Survey first, then work from the outside in

A refurbishment should start with a survey of the whole house, roof included, before anyone prices a single wall. What is found up there decides the order of everything else, and sometimes the budget.

The order that works is the same on nearly every house. Roof, gutters and downpipes first, so the building stops taking in water. Then structure: the openings, the beams, the chimney breasts and any floor joists that need repair. Then services — wiring, pipework and heating — run while the walls and floors are open. Then plaster, which needs time to dry. Joinery, floors and decorating come last, when nothing else is going to be cut into them.

Get that order wrong and you pay twice. New plaster under a gutter that still overflows soon blows. A fresh ceiling goes up and comes down again for a cable somebody forgot. A floor gets sanded before three boards in the middle of it are lifted for pipework.

If a scaffold is going up anyway, the roof, gutters, fascias and chimney stacks should be done while it stands. Access is a large part of the cost of most roof work, and on a refurbishment it is paid for once.

02

What a full refurbishment covers

A refurbishment keeps the footprint of the house and puts right what is inside it and over it. These are the parts of the job. Electrics, gas and heating have their own section further down, because the rules on who may do them matter more than anything on this list.

Knock-throughs and structural openings
A load-bearing wall opened up or taken out on a steel beam sized by a structural engineer, propped while it goes in, and made good on both sides.
Replastering
Walls and ceilings replastered where the old plaster has failed, and made good.
Making good
Chases, old openings, cracked ceiling lines and the scars left by removed fittings, brought back flush before anything is decorated.
Floors
Boards lifted for the services and re-fixed.
Joinery
Skirtings, architraves, doors and linings put back, repaired or matched to what the house still has.
Decorating
Walls, ceilings and woodwork, once the new plaster has dried out.
The roof, gutters and chimneys
Slipped slates, tired leadwork, blocked gutters and a stack that needs repointing, dealt with while the scaffold is up. It is the firm's own trade.
03

Knock-throughs, openings and chimney breasts

Most Victorian and Edwardian houses in South London have a wall between the front and back reception rooms, and many owners want it gone. Whether that wall is load-bearing decides everything. A wall that carries floor joists, a wall above or part of the roof is load-bearing — and so, often, is one that looks too thin to be.

As the rules stand, removing a load-bearing wall or a chimney breast needs a structural engineer's calculation, temporary support while the steel goes in, and Building Regulations approval. Building control inspects the work in stages and issues a completion certificate at the end. Keep it. A buyer's solicitor will ask for it, and a knock-through with no paperwork becomes a question at sale.

In a terrace, the chimney breast and the ends of a new steel often sit in the party wall. Cutting into a party wall comes under the Party Wall etc. Act 1996: as the rules stand, your neighbour gets two months' written notice, and can consent or have a surveyor settle an award. A breast taken out downstairs also leaves the breast above and the stack on the roof to be supported or taken down, and the neighbour's flues may run through the same stack. Ask at the survey who will produce the calculation, who applies to building control and who serves the notice, and get the answers in writing.

04

Plaster, damp and the roof above it

A Victorian house has solid brick walls, plastered in lime. Lime plaster lets the wall breathe: moisture moves in and out of it and dries off. Gypsum on the same wall holds the damp against the brick, softens and blows, and the patch comes back through the new decoration. On a solid wall, lime is usually the right plaster. Gypsum is fine on plasterboard, on stud partitions and on masonry that stays dry.

Old lath-and-plaster ceilings are a choice rather than a rule. A sound one can be repaired and kept, especially under a cornice worth saving. One that has sagged away from its laths is usually taken down and replaced with plasterboard.

Before any wall is replastered, ask why the old plaster failed. On a period house the answer is very often above it — an overflowing gutter, a cracked downpipe joint, a failed flashing where the back addition meets the main wall, or a chimney capped with no vent, so the flue sweats into the breast. Plaster over that and the symptom comes back. It is a common way for a refurbishment to go wrong, and it is roofing work to fix.

Floors have their own version. A suspended timber ground floor relies on air bricks to keep the joists dry. Blocked air bricks, or earth banked up against them outside, are a common cause of soft boards and rotten joist ends.

05

Electrics, gas and the certificates you should end up with

A refurbishment is the time to rewire, because the floors are up and the plaster is off. It is also where the rules are strictest. As the rules stand, new circuits and a new consumer unit are notifiable electrical work under Part P of the Building Regulations, done by a registered electrician who certifies it, or notified to building control. Gas work — a boiler, a hob, a gas pipe rerouted — is for a Gas Safe registered engineer and nobody else.

Replacement windows have to meet the Building Regulations too, as the rules stand, either fitted by an installer registered with a competent-person scheme or approved through building control. In a conservation area with an Article 4 direction, changing the front windows may need planning permission as well.

Whoever quotes a refurbishment, ask who will do each of these, whether they are registered, and whose name goes on the certificates. At the end you should hold certificates for the electrics, for any gas work and for the windows, and a building control completion certificate for the structural work. Those are the papers a buyer's solicitor asks for.

06

Before anything is disturbed

Asbestos first. A house built before 2000 may contain it, and a Victorian house modernised before then may have picked some up in the process: textured ceiling coatings, old floor tiles and their adhesive, boxing round pipes, insulating board near an old boiler. Left intact and undisturbed, it is safe. It is tested before it is disturbed, which on a refurbishment means before the strip-out, not after the first ceiling is down.

Leases next. In a leasehold flat or maisonette you will normally need the freeholder's written consent before work starts — a licence for alterations — and structural work almost always needs it. As the rules stand, householder permitted development does not apply to flats or maisonettes, so changes to the outside usually need planning permission too.

Then CDM 2015. The Construction (Design and Management) Regulations apply to work on your home as well. As the rules stand, a domestic client's duties pass to the contractor, or to the principal contractor where more than one firm is on site. Planning the work safely and running the site sit with them, not with you — but on a job with several trades it is worth knowing in writing which firm that is.

Last, the house itself. A listed house needs listed building consent for work that affects its character, and that can mean work inside as well as out. If the roof is being opened, bats and their roosts are protected, and an ecologist's survey may be needed first. On planning and consents, the council, or the Planning Portal, has the final word.

07

Living in or moving out

Settle this before the price is agreed, because it changes the job. Living in means the work has to go round you: the house done in stages, somewhere kept clean to sleep, water and power off at agreed times rather than whenever. Moving out usually makes the house easier to work in, but it means rent or a spare room with family on top of the build.

Neither is right in general. What decides it is how much of the house is opened up at once, whether there is still somewhere to cook and wash, and who lives there — small children and a house full of drying plaster are a poor mix. Ask at the survey how the work would be ordered if you stay, and which weeks would be the hardest.

Questions

What people ask
about refurbishments

01

What order should a house refurbishment be done in?

Outside in, top down. Roof, gutters and downpipes first so the house stops taking in water, then structural work such as openings and beams, then wiring, pipework and heating while the walls and floors are open, then plastering, with joinery, floors and decorating last. Plastering before the roof is sound, or decorating before the services are in, is how the same work ends up being paid for twice.

02

Do I need a structural engineer to knock through a wall?

If the wall is load-bearing, yes. As the rules stand, removing a load-bearing wall needs a structural engineer's calculation for the beam, temporary support while it goes in, and Building Regulations approval, with building control inspecting the work and issuing a completion certificate. A wall that carries floor joists, a wall above or part of the roof is load-bearing, and some thin-looking walls are. If the steel bears into a party wall, the Party Wall etc. Act 1996 applies as well.

03

Can I remove a chimney breast?

Usually, but it is structural work. As the rules stand, removing a chimney breast needs a structural engineer's calculation, temporary support and building control approval, and whatever sits above it — the breast upstairs and the stack on the roof — has to be supported or taken down properly. In a terrace the breast is often in the party wall, which means two months' written notice to your neighbour under the Party Wall etc. Act 1996. Their flues may share the stack, so they have to be left working.

04

Should a Victorian house be replastered in lime or gypsum?

Solid brick walls are usually best in lime plaster, which lets the wall breathe and dry out. Gypsum on a solid wall tends to hold moisture against the brick, soften and blow. Gypsum is fine on plasterboard, on stud partitions and on masonry that stays dry. Whichever is used, a wall that is still getting wet from outside will fail again, so the source of the water comes first.

05

Why does damp keep coming back after the walls are replastered?

Because the water is still getting in. On a period house the source is often above the patch: an overflowing gutter, a cracked downpipe joint, a failed flashing where a back addition meets the main wall, or a chimney capped with no vent. Plaster over that and the symptom returns. Fix the source, let the wall dry out, then replaster — in lime on a solid wall. Those faults are roofing work, which is Harrington's own trade.

06

Who can do the electrics and gas on a refurbishment?

As the rules stand, new circuits and a new consumer unit are notifiable work under Part P of the Building Regulations, done by a registered electrician or notified to building control. Gas work is for a Gas Safe registered engineer only. Whoever quotes your refurbishment, ask who will do those parts, check the registrations, and make sure the certificates are issued for your address at the end.

07

Could there be asbestos in my house?

If it was built or altered before 2000, possibly. A Victorian house modernised before then may have picked some up: textured ceiling coatings, old floor tiles and their adhesive, boxing round pipes, insulating board near an old boiler. Left intact and undisturbed, asbestos is safe. It should be tested before it is disturbed, which on a refurbishment means before the strip-out starts.

08

I own a leasehold flat. What do I need before refurbishing it?

Normally the freeholder's written consent, known as a licence for alterations, before any work starts — and read the lease, because some forbid structural alterations outright. Building Regulations approval still applies to structural work. As the rules stand, householder permitted development does not apply to flats or maisonettes, so changes to the outside usually need planning permission as well. The council has the final word.

09

Can we live in the house during a full refurbishment?

Some households do and some move out, and it is worth deciding before the price is agreed, because it changes how the job is ordered. The deciding questions are how much of the house is opened up at once, whether there is still somewhere to cook and wash, how long water and power will be off, and who lives there. Ask at the survey which weeks would be the hardest if you stay.

10

What affects the cost of a house refurbishment?

How much structural work the house needs, its size and condition, whether the roof needs work, lime or gypsum plaster, and the finishes you choose. Access matters too: most roof work on a house needs a scaffold, and doing the roof while one is already up saves putting it up twice. Ask how anything found once the walls are open would be priced, before you agree. The survey is free and the quote is a fixed price in writing.

Free quote

Walk us round the house.

We will come and look, photograph what we find, and give you a fixed price in writing. No call-out fee, no obligation.

Or send a photo on WhatsApp (opens in a new tab) — often the fastest way to get an answer.

We use your details to reply to this enquiry and nothing else. See our privacy policy.

Call the team020 7205 4188 (opens in a new tab)Not urgentFree quote