Scaffolding, towers and ladders: what your roof job actually needs

Access is often the biggest single line on a roofing bill, and it has almost nothing to do with the roof.

process9 min read

The short answer

Most single repairs on a two-storey house are a ladder job. A tower is right where the work takes more than about half an hour in one position, or needs two hands and materials. Full scaffold is needed for a whole slope, a ridge run, a chimney rebuild, anything on a third storey, and anything over a public pavement. Scaffold costs more where it has to wrap three or four sides. Expect it named on the quote.

01

What the access is actually paying for

Two separate things. The first is the law. The Work at Height Regulations require the risk to be designed out where it reasonably can be, and a ladder is only accepted for work that is low risk and short duration — the figure the Health and Safety Executive works to is around thirty minutes in one position. Past that you need a working platform with a guardrail, because a man holding on with one hand is a man who will eventually not be holding on.

The second is the work itself. From a ladder you can reach roughly an arm's length either side, you can carry what fits in one hand, and you cannot put anything down. That is enough to hook a slate back in. It is not enough to strip a slope, set battens to a gauge, dress lead over a stack or lay a membrane, because all of those need both hands, a level surface and materials within reach.

So the question is never simply how high the roof is. It is how long someone will be up there, how close to an edge, and how much has to go up and come down with them.

02

When a ladder is honestly enough

Plenty of jobs are. A roofer who reaches for scaffold on every visit is either covering himself or adding a margin, and it is fair to ask why.

One slipped or cracked tile on a rear slope
With a garden to stand the ladder in and firm level ground. Ladder tied at the top, roof ladder hooked over the ridge, an hour's work.
Clearing or realigning a gutter on a two-storey rear
Short spells in each position, nothing carried up but a trowel and a bucket.
A first look
Finding the fault and photographing it. This is what a free survey is, and it should never need hired access.
Refixing a single ridge tile or a loose flashing edge
Where it is reachable from the ladder line and the fix is minutes rather than hours.
03

What stops a ladder being enough

The ground, more often than the roof. A front elevation on a London terrace usually has nowhere to stand a ladder that is not a public footway, and a basement lightwell in front of the bay leaves no solid base at all. Sloping paving, soft borders and a patio over a void all fail the same test.

Weather stops it too. A slate roof is slippery wet and lethal frosted, and a ladder in gusting wind is a lever. Anything fragile underfoot — an old rooflight, a polycarbonate carport, a cement sheet garage roof — needs crawling boards and a platform regardless of height, because those roofs fail through rather than tip you off.

And working over glass changes it completely. A conservatory or a roof lantern below the work means a fall is a fall through glass, and the access has to be built so that nobody and nothing can land on it.

04

When a tower is the right middle answer

A mobile alloy tower is a proper working platform with a guardrail and a toe board, it goes up in about an hour, and it costs a fraction of scaffold. For a lot of London repairs it is exactly right: a chimney flashing on a two-storey rear, a rooflight reseal, a run of fascia and gutter, a small flat roof over a bay or a rear extension.

Its limits are real. It needs firm, level ground with room around it, so it is no use on a slope or a narrow side return. It reaches two to three storeys at the outside. It serves one bay at a time, so a long run means dismantling and rebuilding it along the wall. And it gives you a platform at the eaves, not edge protection on the roof itself — so it does not make a whole slope workable.

05

When full scaffold is not optional

There is a point where nothing else will do, and a roofer who says otherwise is gambling with somebody's back.

A re-roof, or any full slope
Two to four tonnes of old covering comes off and a similar weight goes back up. It needs a loading platform, a debris chute and days of standing near an open edge.
Ridge and hip work along a run
You cannot re-bed twelve metres of ridge from a ladder that reaches one point of it. The mortar has to be mixed, carried and worked in place.
A chimney rebuilt or repointed above the roofline
This needs its own scaffold carried up to the stack with a lift above roof level, so the bricklayer can work around all four faces. It is a separate structure from the elevation scaffold and priced separately.
Third storey and above
Common on London terraces, and the point at which almost every insurer and every scaffolder draws the line.
Any front elevation over a public footway
Not a choice. There is nowhere else to put it, and the pavement then needs a licence from the borough.
Anything above glass or a lightwell
Conservatories, lanterns and basement wells need the load bridged and the glass protected.
06

What drives the cost of access

Scaffold is priced by the scaffolder, not the roofer, and it is quoted as erect, hire for an initial period, then dismantle. The price moves a long way on the details underneath.

Mobile tower, one or two days
Often carried inside the repair price.
How many elevations it covers
The more of the house it wraps, the more it costs: a rear elevation on a two-storey terrace, then front and rear of a terrace for a re-roof, then a semi or detached on three or four sides.
A front over a public footway
Costs more once the licence, any pedestrian gantry and the night lighting are in.
Chimney stack scaffold on its own
Depends on how far above the ridge the stack sits.
Extra hire past the included period
Charged by the week. Worth knowing before a job overruns.
07

Licences, parking and the lead time nobody plans for

Scaffold standing on or overhanging a public footway or road needs a licence from the borough under the Highways Act. Southwark, Lambeth, Lewisham, Wandsworth, Merton, and Hammersmith and Fulham each run their own scheme with their own fee and their own turnaround, and it is days to a fortnight rather than an afternoon. The council will want a drawing and the scaffolder's public liability cover before it grants anything.

The footway has to stay usable, so a narrow pavement usually means a pedestrian gantry or a fenced walkway, plus reflective markers and lighting at night. In a controlled parking zone you will also need a bay suspension for the scaffold lorry and later for the skip, applied for separately and charged by the bay per day. A skip on the highway is a third permit again.

That lead time is why an emergency and a permanent repair are usually two visits. Nobody waits ten days for a licence with water coming in — the first visit is a make-safe from a ladder, and the proper repair happens when the access is legal and in place.

One more thing worth asking about: some home insurers want to be told when scaffold is up against the house, and some ask for a scaffold alarm on the ladder lift, because a scaffold is also a staircase to your first-floor windows.

08

Why a quote with no access on it is not a quote

If two prices for the same roof are a long way apart, the gap is very often the scaffold — one firm has priced it and the other has left it out, intending to raise it once the job is booked and you are committed. That conversation always happens on the morning the work is meant to start.

So make the access its own line and ask five questions of every quote. Is the scaffold in this price or extra. How many elevations does it cover. How long is the hire period included. Who applies for the pavement licence and the bay suspension, and are those fees in the figure. What does an extra week cost.

The other side of that is worth knowing too. Access is a fixed cost that does not care how much work you do while it is there. If the ridge needs re-bedding, the chimney needs repointing, the fascias are rotten and the gutters need replacing, doing all four on one scaffold costs far less than four visits with four lots of access. Send the whole list rather than the one thing that is leaking.

We tell you which of the three — ladder, tower or scaffold — your job needs at the survey, before you have spent anything, and it goes on the written quote as its own figure rather than disappearing into a rate.

Questions

01

Can my roof be repaired without scaffolding

Often, yes. A single slipped tile, a gutter clear or a small flashing repair on a two-storey rear is normally a ladder and roof ladder job, and pricing scaffold into it would be padding. It stops being reasonable once the work runs beyond about half an hour in one spot, sits above a third storey, needs materials carried up, or has nowhere solid to stand a ladder.

02

How long does scaffolding usually stay up

Most London scaffold prices include an initial hire period of roughly four to eight weeks, which is far longer than a typical roof job needs. Add a day at the start for it to go up and a day at the end for it to come down, and remember the scaffolder works to his own diary — a job finishing on a Friday may not be struck until the following week.

03

Do I need a licence to put scaffolding on my own drive

No. A licence is only needed where the scaffold stands on or overhangs the public highway, including the footway. On your own land it is a private arrangement. If it needs to stand on a neighbour's ground, or a tie has to go into their wall, that is their consent to give and it is much easier asked early and in writing than argued about later.

04

Who applies for the pavement licence, and who pays

The scaffolding contractor normally applies, because the licence is issued against their insurance and their drawing. The fee is usually passed on to you, either inside the scaffold price or as a named extra. Ask which of the two it is, because it is a common place for an extra charge to appear after the fact.

05

Will scaffolding damage my garden or patio

It should not, but it puts real point loads on the ground. Standards sit on base plates on timber sole boards to spread the weight, and on a lawn that will still leave marks and on old paving it can crack a slab if the boards are skipped. Say what is underneath before the scaffolders arrive, and photograph the ground beforehand.

06

Could a cherry picker be used instead of scaffolding

Sometimes, for short work at height where there is hardstanding to set the outriggers on and room to swing. It suits a one-off inspection or a single high repair. For anything lasting days it works out dearer than scaffold, it usually needs the road or the bays anyway, and on most London terraces there is simply nowhere to park it.

07

Is scaffolding a security risk while it is up

It is a route to your upper windows, so treat it as one. The bottom ladder should be removed or clamped behind a ladder guard at the end of each day, upstairs windows want locking rather than leaving on the vent, and it is worth telling your insurer it is there. Some policies ask for an alarm on the ladder lift for exactly this reason.